SEE AN ORGANIZED JOBSITE

Every detail has
one place to live.

Plans begin as a long project set. Estimates begin as a long list. Photos land in text messages. BuildTether connects those facts to the room, trade and timeline where the work actually happens.
Organize a project free →See the step-by-step tutorial

FROM PROJECT PILE TO FIELD-READY

What “organized” means in BuildTether

01 · INPUT

Upload the project facts

  • Complete plan set
  • Fixture and finish schedules
  • Contractor estimate
  • 3D models and elevations
02 · BUILDTETHER AI

Prepare contractor review drafts

  • Separate and rename plan sheets
  • Assign pages and products by room
  • Find exact-model manufacturer documents
  • Draft the Living Schedule and critical path
03 · FIELD

One current record

  • One permanent QR per room
  • Current approved notes and photos
  • Trade-specific information
  • Printable, continuously updated Gantt chart

ROOM 03 · KITCHEN

One scan shows only what belongs here.

Contractor approved · current now
Relevant plan sheetsA2.1 · Main-level planE3.2 · Kitchen electricalP4.1 · Kitchen plumbing
Fixtures + exact modelsKitchen sink · AL3220AF100Faucet · MB7930LMSTN-2Soap dispenser · LS3550STN
Current field recordWindow delivery · Oct 12Electrical photo · doorway wiresCabinet layout · contractor approved

THE LIVING SCHEDULE

Project scope becomes a dated schedule that stays alive.

BuildTether combines the estimate and organized plans with AI construction-scheduling knowledge to predict the first draft. It creates detailed activities, projected start and finish dates, parallel trade work, inspection gates, milestones and the critical path. The contractor edits and approves the official schedule, then AI reviews field notes and photo captions to suggest changes as work progresses.
  • Use estimate pricing only to understand scope—not as schedule output.
  • Run independent trades in parallel when access allows.
  • Speak: “The windows moved to October 12.”
  • See affected activities and the projected completion date.
  • Print one 24 × 36 master or tiled letter sheets.

AI prepares. The contractor controls.

BuildTether does not quietly publish AI decisions.

Rooms, plan assignments, manufacturer documents, field notes, photo captions and schedule changes remain review drafts until the contractor approves them.Start with your project →